This past weekend I tried to get a head start on framing. So without expecting any laborers friends or neighbors to be able to help, and knowing I’d be out of town the following weekend, I ordered a truckload of lumber and had it delivered. Meantime I got started on sill plates and flashing.

I installed copper termite flashing under the sills. It is supposed to make termites easier to detect by forcing them to tunnel out into the open. It's also pretty.

Between the termite shield and the sill is a foam gasket to stop air leaks.

Some of the anchor bolts were awkwardly placed. Some are where studs should go. This one was a tight fit under the stack cleanout. I couldn't get the sill plate to fit between the top of the bolt and the cleanout. I had to use a grinder to cut off the top of the bolt.

I had to chop off the overhang because the new addition is taller than the room we're attaching it to.

I managed to frame a little over one wall. My neighbor helped do the short wall; the tall one I had to do solo.

I spent a lot of time doing the stud layout. It was made more difficult for two reasons: pipes and anchor bolts. Some of the anchor bolts are where studs should go, as is the greywater pipe for the washing machine. I can’t move the pipes or anchor bolts, so I either have to adjust the stud placement or notch the studs to fit over or around the anchor bolts.

Since the south windows are eight feet up, the view is of trees and blue sky. The window placement is great for passive solar heating in the winter, too.

This is the view from the back patio, with the bedroom to the left. The building on the right is the shed, so you can see there is a sort of outdoor hallway to get behind the new bathroom. I'll put a gate back there to create a sort of secret garden. Don't tell anyone.